Location |
Sari, Mazandaran,
(North of Iran) |
Client |
Mazandaran Regional
Water Board |
Consulting Engineers |
Mahab Ghodss Consulting
Eng. |
Contractor |
Tablieh-Perlite J.V. |
Tablieh Position |
50% Contract Share and
leading member of JV |
Contract Sum |
28,300,000,000
Rials+70,000,000,00 USD |
|
Equal to 100,000,000
USD |
Contract Period |
60 Month (1991 - 1996) |
Status |
Completed |
Concrete Arch Dam:
Height
Length of Crest
Width at Base
Width at Crest |
138 m
416 m
27 m
6 m |
SPILLWAY:
94.60 m wide, capable of discharging 2,000 m3/sec.
Equipped with service bridge
POWER INTAKE:
40m length, 2m diameter penstock, with 18m3/sec capacity.
Suitable for 3 vertical axis Francis Turbines
IRRIGATION INTAKE:
Two parallel 1.4m diameter with a capacity of 28m3/sec.
Equipped with butterfly and hollow-jet valves
BOTTOM OUTLET:
1.5 x 2.2 m with a 106m3/sec discharge capacity
MAJOR ACTIVITES &
QUANTITES :
Excavation |
550,000 m3 |
Mass Concrete Volume |
700,000 m3 |
Shuttering |
125,000 m2 |
Structural Concreting |
30,000 m3 |
Drilling and Grouting |
90,000 m |
Tunneling (grouting
& Drainage Galleries) |
3,000 m |
Camp |
16,000 m2 |
|